Build Faster. Operate Smarter.
Reduce commissioning time by 40% and transform O&M from reactive repairs to strategic asset management.
For EPCs
Prove Quality. Eliminate Risk.
Digitize your commissioning process.
Commissioning a plant usually involves expensive manual testing and disputes over “hidden” defects. SunSniffer automates the validation of your work.
Instant String Validation
Verify correct cabling and module count instantly via
the portal. No manual “walking the lines” required.
Digital Birth Certificate
Deliver the plant with a complete, serial-number-specific dataset of every module’s health.
Zero-Dispute Handover
Prove that 100% of modules perform at STC specs on Day 1. If a module breaks later, you have the data to prove it wasn’t an installation error.
“Hand over a digital twin, not just a physical asset.”
For O&M
Stop Searching. Start Fixing.
The end of random thermal inspections.
Traditional O&M is reactive. You wait for an alarm, then send a team to hunt for the problem with drones or handheld devices. SunSniffer changes the workflow.
No More False Alarms
TrueSTC™ filters out weather noise. If we send an alert,
there is a real physical defect.
Pinpoint Accuracy
We tell you exactly which module (Serial #12345), in which string, has the problem.
Root Cause Analysis
Ray AI identifies the type of defect remotely (e.g., “Diode Failure,” “PID,” “Soiling”).
The Result
Your technician arrives with a clear mission: Swap the defective unit, Move it to a lower-performing string, or Keep it under watch. One truck roll. Optimized String.
Strategic Asset Management
The ROI of Replacement.
Future-Proofing via IEA-Standard Analysis.
Deciding when to replace a degrading module is complex. Replace too early, you waste money. Replace too late, you lose yield.
Automated Degradation Tracking
We measure the exact power loss of every module in real-time.
IEA Future-Cast
Using IEA classifi
cation standards, we project the future degradation curve of the asset.
The ROI Calculator
Cost of Replacement (Hardware + Labor) vs. Value of Recovered Energy (over 5, 10, 20 years).
The Decision
“Replace Module #402 now for a +12% IRR” or “Keep Module
#805 until 2028.”
